Market announcement
Arco Vara AS
LEI code
097900BHCB0000066171
Size of the entity
Small group
Economic activities
Professional, Scientific and Technical Activities
Country of registered office
Estonia
General information
Categories
Management interim statement or quarterly financial report
Unique data record identifier
3707
Attachments
Submission date and time
18.05.2012 17:34:05
Content of announcement in Estonian
Title
18.05.2012: Arco Vara AS 2012. aasta I kvartali vahearuanne
Message
Juhatuse esimehe kommentaarid
2012. aasta tähtsaimaks sündmuseks vahearuande koostamise kuupäeva seisuga
tuleb pidada Arco Vara AS-i nõukogu liikmete vahetust. Nimelt on bilansipäeva
järgselt tagasi astunud kolm sõltumatut nõukogu liiget: Ragnar Meitern, Kalev
Tanner ja Aare Tark. Nende asemel on nimetatud uuteks nõukogu liikmeteks Toomas
Tool, Stephan David Balkin ja Aivar Pilv. Nõukogus on nüüd esindatud kolm
suurimat aktsionäri, kes kokku esindavad üle 62% aktsiatega esindatud häältest.
Esimese kvartali puhaskahjum 0.9 mln eurot on põhiosas tingitud
kinnisvarainvesteeringu müügitehingust Tallinnas, kus realiseeriti Kadaka tee
131 kinnistu hoonestusõigus, vastav info on varem avaldatud. Muus osas on
kontserni majandustegevus olnud ootuspärane ja kasumlikum kui 2011. aasta
teisel poolel.
2012. aasta l kvartalis müüdi Arco Vara projektides 4 korterit, millest 1
Eestis ja 3 Lätis, siin ei sisaldu veel värskelt valminud Manastirski
kortermaja ja juunis valmiva kahe Kodukolde maja korterite müüki, kus hetkel
sõlmitud vaid võlaõiguslepinguid ja müük kajastub käibenumbrites alates II
kvartalist.
Olulisematest töödest kestavad Tallinnas Tivoli-nimelise suuremahulise
korterelamu arenduse projekteerimine ja ehituskonkurss. 2011. aasta II
kvartalis alustatud Kodukolde kuuenda etapi (48 korteri) ehitamine Helme 16
Tallinnas lõppeb juunis 2012. I kvartali lõpu seisuga on valmivatest
korteritest võlaõiguslike lepingutega broneeritud 52% korteritest. Täiendavalt
oleme teatanud Tallinnas Tehnika tänaval 14 korteriga korterelamu arendamisega
alustamisest. Planeeritud ehitustegevuseks on 14 kuud ning korterite eelmüügiga
alustasime mais 2012.
Bulgaarias on lõppenud enam kui 7 000 ruutmeetrise Manastirski I etapi ehitus.
I etapis valminud korteritest on bilansipäeva seisuga broneeritud 65%.
Boulevard Residence Madrid äri- ja eluhoones Sofias jätkub äripindade
väljarentimine ning broneeritud korterite asjaõiguslepingute sõlmimine ja
vabade korterite müük.
Läti Bišumuiža 1 korterelamute arendusprojektis valmib 2012 juunis teise etapi
raames neljas hoone 14 korteriga. Lisaks Bišumuiža 1 korterite müügile jätkub
töö ka Mazais Baltezers kruntide realiseerimisel. Arendusprojektide valmimine
mõjutab oluliselt Kontserni käivet, kuna müük kajastub käibenumbrites alati
peale ehituse valmimist, mitte selle ajal.
Eesmärgiga parandada Kontserni likviidsust ning vähendada kohustusi võõrandas
Kontserni tütarettevõte OÜ Kerberon hoonestusõiguse aadressil Kadaka tee 131.
Kinnistul asunud äri ja laokompleksi võõrandamisega vähenesid Kontserni
kohustused 2,2 mln euro võrra ning paranes ettevõtte likviidsuspositsioon,
samas raamatupidamislikult teeniti 0,7 mln eurot kahjumit.
Teenindusdivisjoni tulemus on 2012. aasta I kvartalis olnud parem kui aasta
varem. 2012. aasta I kvartali müügitulu oli 573 tuhat eurot, mida on 13% rohkem
võrreldes 2011. aasta I kvartaliga. Kontserni vahendustehingute arv võrreldes
eelmise aasta sama perioodiga on tõusnud 11% ning hindamisaktide arv 9%. Samal
ajal kui maaklerite arv suurenenud vaid 1% ja hindajate arv jäänud samaks. I
kvartali jooksul on teenindusdivisjon käivitanud hindamistegevuse Bulgaarias.
2012. aasta I kvartalis sõlmiti uusi ehituslepinguid 2,9 mln euro väärtuses.
Ehituslepingute järelejäänud maht on 2012. aasta I kvartali lõpu seisuga 12,9
mln eurot võrreldes 2011. aasta I kvartali lõpu 19 mln euroga. Ehitusdivisjon
teenis 2012. aasta I kvartalis ärikasumit 0,4 mln eurot võrreldes 0,1 mln euro
suuruse kahjumiga 2011. aasta I kvartalis.
Bilansipäeva järgselt, aprilli 2012 võõrandas Kontsern osaluse ühisettevõttes
Bišumuižas Nami SIA partnerile SIA Linstow Baltic. Arco Vara otsis projektist
väljumiseks võimalust enam kui aasta. Nimetatud tehinguga kadus kohustus
toetada ühisettevõtet korterelamute arendamisel ja laenukohustuste
teenindamisel. 2011. aastal finantseerisime ühisettevõtet summas 0,3 mln eurot
ja ainuüksi pangalaenu oli Bišumuižas Nami SIA-l kokku 14 mln eurot.
2012. aasta I kvartaliga on Kontserni laenukohustuste saldo vähenenud 1 mln
euro võrra ning omakapitali osakaal ligi 40% on praktiliselt jäänud samaks.
Laenukohustuste keskmine kaalutud intress on võrreldes aastatagusega langenud
0,1% võrra ennekõike tänu EURIBOR-i langusele, veidi on pikenenud
laenukohustuste kaalutud keskmine tähtaeg 2,1-lt aastalt 2,3-le aastale.
PÕHILISED NÄITAJAD
-- 2012. aasta I kvartali müügitulu oli 3,6 mln eurot. 2011. aasta I
kvartali tulemus oli 13,3 mln eurot (sh 8,3 mln eurot Tivoli projekti
kinnistute müük). Jättes kõrvale Tivoli tehingu mõju oli müügitulu 2012.
aasta esimese kolme kuuga 27% väiksem kui aasta tagasi samal perioodil.
-- Ärikahjum oli 0,5 mln eurot, mis on kahanenud 48% võrreldes 2011. aasta
sama perioodiga, kui ärikahjum oli 0,9 mln eurot.
-- I kvartali puhaskahjum oli 0,9 mln eurot, mis on 35% vähem võrreldes
eelmise aasta I kvartaliga, kui puhaskahjum oli 1,3 mln eurot.
-- Omakapital moodustab 40,1% varade mahust (31.12.2011: 39,7%). Jooksva 12
kuu omakapitali tootlikkus oli negatiivne.
-- Ehituslepingute järelejäänud maht oli I kvartali lõpu seisuga 12,9 mln
eurot, 2011 I kvartali lõpus 19,0 mln eurot.
-- I kvartalis müüdi Kontserni poolt arendatavates projektides 4 korterit ja
krunti (2011: 13 korterit ja krunti).
I kvartal 2012 I kvartal 2011
----------------------------------------------------------------------------
EUR miljonites
----------------------------------------------------------------------------
Müügitulu 3,6 13,3
----------------------------------------------------------------------------
Ärikasum -0,5 -0,9
----------------------------------------------------------------------------
Puhaskahjum -0,9 -1,3
----------------------------------------------------------------------------
----------------------------------------------------------------------------
EPS (eurodes) -0,18 -0,28
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Varad kokku, perioodi lõpu seisuga 57,7 65,5
----------------------------------------------------------------------------
Investeeritud kapital, perioodi lõpu seisuga 47,1 53,2
----------------------------------------------------------------------------
Netolaenud, perioodi lõpu seisuga 22,3 24,4
----------------------------------------------------------------------------
Omakapital, perioodi lõpu seisuga 23,1 26,5
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Laenude keskmine pikkus (aastates) 2,3 2,1
----------------------------------------------------------------------------
Laenude keskmine intress (aastas) 6,9% 7,0%
----------------------------------------------------------------------------
ROIC (jooksev 4 kvartalit) neg 1,2%
----------------------------------------------------------------------------
ROE (jooksev 4 kvartalit) neg neg
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Töötajate arv perioodi lõpul 140 150
----------------------------------------------------------------------------
TULUD JA KASUM
I kvartal 2012 I kvartal 2011
-------------------------------------------------------
EUR miljonites
-------------------------------------------------------
Müügitulu
-------------------------------------------------------
Teenindus 0,6 0,5
-------------------------------------------------------
Arendus 0,7 9,9
-------------------------------------------------------
Ehitus 2,4 2,9
-------------------------------------------------------
Elimineerimine -0,1 0,0
-------------------------------------------------------
Müügitulu kokku 3,6 13,3
-------------------------------------------------------
-------------------------------------------------------
Ärikasum
-------------------------------------------------------
Teenindus 0,0 0,0
-------------------------------------------------------
Arendus -0,6 -0,6
-------------------------------------------------------
Ehitus 0,4 -0,1
-------------------------------------------------------
Elimineerimine 0,0 0,1
-------------------------------------------------------
Jagamatud tulud-kulud -0,3 -0,3
-------------------------------------------------------
Ärikasum kokku -0,5 -0,9
-------------------------------------------------------
-------------------------------------------------------
Intressitulud ja -kulud -0,4 -0,4
-------------------------------------------------------
Puhaskahjum -0,9 -1,3
-------------------------------------------------------
Arenduse divisjoni müügitulu mõjutas 2011. aasta I kvartalis oluliselt
ühisettevõttele Tivoli Arendus OÜ-le müüdud varud summas 8,3 mln eurot.
RAHAVOOD
I kvartal 2012 I kvartal 2011
--------------------------------------------------------------------------
EUR miljonites
--------------------------------------------------------------------------
Äritegevuse rahavood -1,2 -0,7
--------------------------------------------------------------------------
Investeerimistegevuse rahavood 1,0 -0,4
--------------------------------------------------------------------------
Finantseerimistegevuse rahavood -0,3 -0,9
--------------------------------------------------------------------------
Perioodi rahavood kokku -0,4 -2,0
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Raha ja raja ekvivalendid perioodi alguses 2,2 4,2
--------------------------------------------------------------------------
Raha ja raha ekvivalendid perioodi lõpus 1,8 2,2
--------------------------------------------------------------------------
Suurimad lühiajalised laenukohustused järgmise 12 kuu jooksul:
-- arvestuslik põhiosa tagastus broneeritud pindade müügist ning vastavalt
tagastusgraafikule projektis Boulevard Residence Madrid Sofias summas 2,5
mln eurot;
-- Manastirski projekti laen summas 1,9 mln eurot;
-- AS Kolde ehituslaen summas 2,4 mln eurot;
-- Bišumuiža 1 projekti laen summas 0,5 mln eurot.
2012. aasta I kvartali jooksul on makstud laenu tagasi Bišumuiža-1 projektis
Riias ning tagastatud täielikult Kerberoni laen.
Lisaks on graafikujärgsed laenutagastused toimunud rahavoogu tootvates
projektides ning põhiosa tagasimaksega graafikud olid kehtestatud ka Koduküla
OÜ pangalaenule.
TEENINDUSDIVISJON
Teenindusdivisjoni tulemus on 2012. aasta I kvartalis olnud parem kui aasta
varem. 2012. aasta I kvartali ärikahjum oli kokku 5 tuhat eurot võrreldes 32
tuhande euro suuruse ärikahjumiga 2011. aasta I kvartalis. 2012. aasta I
kvartali müügitulu oli 573 tuhat eurot, mida on 13% rohkem võrreldes 2011.
aasta I kvartaliga. Kontserni vahendustehingute arv võrreldes eelmise aasta
sama perioodiga on tõusnud 11% ning hindamisaktide arv 9%. Samal ajal on
maaklerite arv suurenenud vaid 1% ja hindajate arv jäänud samaks.
I kvartal 2012 I kvartal 2011 muutus, %
--------------------------------------------------------------------------------
Vahendatud objektide arv perioodis 313 281 11%
--------------------------------------------------------------------------------
Müügis olevad projektid perioodi 162 158 3%
lõpus, tk
--------------------------------------------------------------------------------
Hindamisaktide arv perioodis 1382 1 270 9%
--------------------------------------------------------------------------------
Hindajate arv perioodi lõpus¹ 39 39 0%
--------------------------------------------------------------------------------
Maaklerite arv perioodi lõpus¹ 75 69 1%
--------------------------------------------------------------------------------
Divisjoni töötajate arv perioodi 45 49 -8%
lõpus
--------------------------------------------------------------------------------
¹ sisaldab käsunduslepinguid
ARENDUSDIVISJON
2012. aasta I kvartalis müüdi Arco Vara projektides 4 korterit. Lätis müüdi 3
Bišumuiža korterit ning Eestis 1 Kodukolde korter. Tähelepanu tuleb juhtida
asjaolule, et välja toodud müüginumbrid ei sisalda veel värskelt valminud
Manastirski kortermaja ja juunis valmiva kahe Kodukolde maja korterite müüki,
kus hetkel sõlmitud vaid võlaõiguslepinguid. Nimetatud korterite müük kajastub
müüginumbrites alates II kvartalist.
Tivoli projekti kaasati 2011. aastal partner International Invest Project OÜ
ning rahastus I etapi ehituseks. 2011. aastal likvideeriti kinnistutelt reostus
ning alustati projekteerimistegevust. IV kvartalis väljastati Tivoli Arendus
OÜ-le ehitusluba kuue elamu ehitamiseks. Ehitustegevusega planeeritakse
alustada 2012. aasta suvel.
2011. aasta juunis valmis Kodukolde arendusprojekti viies etapp 50 korteriga.
2012. aasta I kvartali lõpuks on kõik korterid müüdud. 2011. aasta II kvartalis
alustati Kodukolde kuuenda etapi (48 korteri) ehitamisega Helme 16 Tallinnas.
Ehitustöid teostab ja olulises osas finantseerib AS Merko Ehitus Eesti. Majade
oodatav valmimine on 2012. aasta juunis. I kvartali lõpu seisuga on
valmivatest korteritest võlaõiguslike lepingutega broneeritud pooled
korteritest.
Tehnika tn 53 projekteeritud B energiaklassile vastava elu-ja ärihoonele nimega
Kastanimaja saadi ehitusluba jaanuaris 2012. I kvartalis viidi läbi
ehituskonkurss ning hetkel peetakse läbirääkimisi kahe parima pakkujaga
ehituslepingu sõlmimiseks. Planeeritud ehitustegevuseks on 14 kuud ning
korterite eelmüügiga alustati mais 2012.
Bulgaarias on lõppenud Manastirski projekti I etapi ehitus. I etapis valminud
korteritest on 31.03.2012 seisuga broneeritud 65%. Boulevard Residence Madrid
äri- ja eluhoones Sofias jätkub äripindade väljarentimine ning broneeritud
korterite asjaõiguslepingute sõlmimine ja vabade korterite müük.
Lätis Bišumuiža 1 korterelamute arendusprojektis valmib 2012 juunis teise etapi
raames neljas hoone 14 korteriga. Teine etapp hõlmab kokku viite hoonet.
2012. aasta märtsi lõpu seisuga töötas divisjonis kokku 25 inimest (31.12.2011
seisuga 24 inimest).
Projektide kohta leiab lisainfot: www.arcorealestate.com/arendus
EHITUSDIVISJON
Ehitusdivisjon on spetsialiseerinud keskkonna- ja infrastruktuuriprojektide
ehitusele.
2012. aasta I kvartali lõpu seisuga on suuremateks käimasolevateks
ehitusprojektideks Suure-Jaani valla ühisveevärgi ja kanalisatsiooni-süsteemide
rekonstrueerimine ja laiendamine, projekteerimis-ehitustöövõtt kahes etapis
kokku jäägiga 3,9 mln eurot, Paide reoveepuhastusjaama ehitus jäägiga 2,7 mln
eurot, Loksa linna vee- ja kanalisatsiooni-torustike projekteerimis-ehitustööd
jäägiga 2,5 mln eurot ning Kuusalu ühisveevärgi ja kanalisatsiooni ehitus
jäägiga 2 mln eurot.
2012. aasta I kvartalis sõlmiti uusi ehituslepinguid 2,9 mln euro väärtuses.
Ehituslepingute järelejäänud maht on 2012. aasta I kvartali lõpu seisuga 12,9
mln eurot võrreldes 2011. aasta I kvartali lõpu 19,0 mln euroga.
2012. aasta märtsi lõpu seisuga töötas divisjonis kokku 53 inimest (31.12.2011
seisuga 58 inimest).
Konsolideeritud koondkasumiaruanne
Lisa I kvartal 2012 I kvartal 2011
--------------------------------------------------------------------------------
EUR tuhandetes
--------------------------------------------------------------------------------
Müügitulu teenuste müügist 3 368 3 737
--------------------------------------------------------------------------------
Müügitulu kaupade müügist 260 9 522
--------------------------------------------------------------------------------
Müügitulu kokku 2,3 3 628 13 259
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Müüdud toodangu kulu 4 -2 815 -12 692
--------------------------------------------------------------------------------
Brutokasum 813 567
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Muud äritulud 7 192 5
--------------------------------------------------------------------------------
Turustuskulud 5 -82 -102
--------------------------------------------------------------------------------
Üldhalduskulud 6 -697 -1 361
--------------------------------------------------------------------------------
Muud ärikulud 7 -716 -43
--------------------------------------------------------------------------------
Ärikasum -490 -934
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Finantstulud 8 22 34
--------------------------------------------------------------------------------
Finantskulud 8 -394 -421
--------------------------------------------------------------------------------
Kasum enne tulumaksu -862 -1 321
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Aruandeperioodi puhaskasum -862 -1 321
--------------------------------------------------------------------------------
-------------------------------------------------
Emaettevõtte omanike osa puhaskasumis -847 -1 334
-------------------------------
Mitte-kontrolliva osaluse osa puhaskasumis -15 13
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Aruandeperioodi koondkasum -862 -1 321
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Aktsia puhaskasum (eurodes) 9
--------------------------------------------------------------------------------
- tava -0,18 -0,28
--------------------------------------------------------------------------------
- lahustatud -0,18 -0,28
--------------------------------------------------------------------------------
Konsolideeritud finantsseisundi aruanne
Lisa 31.03.2012 31.12.2011
--------------------------------------------------------------------------------
EUR tuhandetes
--------------------------------------------------------------------------------
Raha ja raha ekvivalendid 1 787 2 209
--------------------------------------------------------------------------------
Nõuded ostjate vastu ja muud nõuded 10 7 648 7 012
--------------------------------------------------------------------------------
Ettemaksed 397 433
--------------------------------------------------------------------------------
Varud 11 23 178 21 564
--------------------------------------------------------------------------------
Müügiootel põhivara 0 469
--------------------------------------------------------------------------------
Käibevara kokku 33 010 31 687
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Kapitaliosaluse meetodil kajastatavad 4 4
investeeringud
-----------------------------
Muud finantsinvesteeringud 8 8
--------------------------------------------------------------------------------
Nõuded ostjate vastu ja muud nõuded 10 3 135 3 058
--------------------------------------------------------------------------------
Edasilükkunud tulumaks 250 250
-----------------------------
Kinnisvarainvesteeringud 12 20 306 24 046
--------------------------------------------------------------------------------
Materiaalne põhivara 920 934
--------------------------------------------------------------------------------
Immateriaalne põhivara 25 26
--------------------------------------------------------------------------------
Põhivara kokku 24 648 28 326
--------------------------------------------------------------------------------
VARAD KOKKU 57 658 60 013
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Laenukohustused 13 9 425 9 662
--------------------------------------------------------------------------------
Võlad tarnijatele ja muud võlad 14 6 930 7 735
--------------------------------------------------------------------------------
Saadud ettemaksed 2 304 2 012
--------------------------------------------------------------------------------
Eraldised 1 201 1 205
--------------------------------------------------------------------------------
Lühiajalised kohustused kokku 19 860 20 614
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Laenukohustused 13 13 929 14 675
--------------------------------------------------------------------------------
Muud võlad 14 748 741
--------------------------------------------------------------------------------
Pikaajalised kohustused kokku 14 677 15 416
--------------------------------------------------------------------------------
KOHUSTUSED KOKKU 34 537 36 030
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Aktsiakapital 3 319 3 319
--------------------------------------------------------------------------------
Kohustuslik reservkapital 2 011 2 011
--------------------------------------------------------------------------------
Jaotamata kasum 17 791 18 653
--------------------------------------------------------------------------------
Omakapital kokku 23 121 23 983
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Mitte-kontrollivale osalusele kuuluv omakapital 140 155
--------------------------------------------------------------------------------
Emaettevõtte omanikele kuuluv omakapital 22 981 23 828
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
KOHUSTUSED JA OMAKAPITAL KOKKU 57 658 60 013
--------------------------------------------------------------------------------
Konsolideeritud rahavoogude aruanne
Lisa I kvartal I kvartal
2012 2011
--------------------------------------------------------------------------------
EUR tuhandetes
--------------------------------------------------------------------------------
Puhaskasum -862 -1 321
--------------------------------------------------------------------------------
Intressitulud ja -kulud 8 321 355
--------------------------------------------------------------------------------
Kahjum kinnisvarainvesteeringute müügist 7 712 0
--------------------------------------------------------------------------------
Materiaalse ja immateriaalse põhivara 4,6 23 25
amortisatsioon ja väärtuse langus
--------------------------------------------------------------------------------
Valuutakursi kasumid ja kahjumid 8 3 4
--------------------------------------------------------------------------------
Äritegevuse rahavood enne käibekapitali muutuseid 197 -937
--------------------------------------------------------------------------------
Äritegevusega seotud nõuete ja tehtud ettemaksete 169 -1 866
muutus
--------------------------------------------------------------------------------
Varude muutus -953 1 504
--------------------------------------------------------------------------------
Äritegevusega seotud kohustuste ja saadud -575 591
ettemaksete muutus
--------------------------------------------------------------------------------
RAHAVOOD ÄRITEGEVUSEST KOKKU -1 162 -708
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Materiaalse ja immateriaalse põhivara soetus -12 -2
--------------------------------------------------------------------------------
Kinnisvarainvesteeringute arendusel tasutud summad 0 -557
--------------------------------------------------------------------------------
Kinnisvarainvesteeringute müük 1 140 177
--------------------------------------------------------------------------------
Tütar- ja ühisettevõtete soetus 0 1
--------------------------------------------------------------------------------
Antud laenud 15 -63 -67
--------------------------------------------------------------------------------
Antud laenude tagasimaksed 0 29
--------------------------------------------------------------------------------
Muud tasumised investeerimistegevusest -29 0
--------------------------------------------------------------------------------
Saadud intressid 3 24
--------------------------------------------------------------------------------
RAHAVOOD INVESTEERIMISTEGEVUSEST KOKKU 1 039 -395
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Saadud laenud 13 261 504
--------------------------------------------------------------------------------
Laenude ja kapitalirendikohustuste tagasimaksed 13 -165 -876
--------------------------------------------------------------------------------
Makstud intressid -393 -537
--------------------------------------------------------------------------------
Muud tasumised finantseerimistegevusest -2 0
--------------------------------------------------------------------------------
RAHAVOOD FINANTSEERIMISEGEVUSEST KOKKU -299 -909
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
RAHAVOOD KOKKU -422 -2 012
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Raha ja raha ekvivalendid perioodi alguses 2 209 4 209
--------------------------------------------------------------------------------
Raha ja raha ekvivalentide muutus -422 -2 012
--------------------------------------------------------------------------------
Raha ja raha ekvivalendid perioodi lõpus 1 787 2 197
--------------------------------------------------------------------------------
Egert Paulberg
Finantskontroller
Arco Vara AS
Tel: +372 614 4503
[email protected]
Content of announcement in English
Title
18.05.2012: Arco Vara AS Interim report I quarter 2012
Message
Group Chief Executive’s review
At the date of release of this report, the most important event of 2012 has
been a change in the composition of the supervisory board of Arco Vara AS.
Since the reporting date, three independent supervisory board members, Ragnar
Meitern, Kalev Tanner and Aare Tark, have resigned and Toomas Tool, Stephan
David Balkin and Aivar Pilv have been elected in their place. Now, three of the
company’s largest shareholders who together hold over 62% of the votes
represented by shares are represented on the supervisory board.
The first quarter net loss of 0.9 million euros results mainly from the sale of
an investment property, i.e. a right of superficies at Kadaka tee 131 in
Tallinn. Corresponding information has already been disclosed earlier. In other
respects, the Group’s performance met expectations and was more profitable than
in the second half of 2011.
In the first quarter of 2012, we sold four apartments in Arco Vara’s projects:
one in Estonia and three in Latvia. The figure does not include the apartments
sold in the recently completed Manastirski apartment block and the two
Kodukolde apartment buildings that will be completed in June, because currently
we have concluded only contracts under the law of obligations there (presale
contracts). The sales of those apartments will be included in revenue from the
second quarter.
As regards major ongoing work, the large-scale Tivoli apartment project is in
the design phase and we have invited tenders from potential builders. The
construction of phase VI in the Kodukolde project (48 apartments) at Helme 16
in Tallinn, which was started in the second quarter of 2011, will be completed
in June 2012. By the end of the first quarter, 52% of the new Kodukolde
apartments had been reserved. We have also started development of a residential
building with 14 apartments in Tehnika street in Tallinn. Construction term
is14 months, pre-sale began in May 2012.
We have completed the construction of 7,000 square metres in phase I of the
Manastirski project in Bulgaria. By the reporting date, 65% of the apartments
in phase I had been reserved. In the commercial and residential building
Boulevard Residence Madrid in Sofia, we continue to lease out commercial
premises, to deliver reserved apartments under real right contracts (final
contracts by which title is transferred), and to sell the remaining free
apartments.
In the Bišumuiža 1 apartment project in Latvia, we will complete the fourth
building of stage II (14 apartments) in June 2012. In addition to selling the
apartments of Bišumuiža 1, we continue realising plots in the Mazais Baltezers
project. Completion of development projects has a strong impact on the Group’s
revenue, because sales are recognised as revenue when construction has been
completed, not when it is in progress.
To improve the Group’s liquidity and reduce its liabilities, the Group’s
subsidiary OÜ Kerberon sold the right of superficies at Kadaka tee 131 in
Tallinn. By divesting a business and warehouse complex on the property, the
Group reduced its liabilities by 2.2 million euros and improved its liquidity
although the transaction resulted in a loss of 0.7 million euros.
In the first quarter of 2012, the Service division performed better than a year
ago, generating revenue of 573 thousand euros, 13% up on a year ago. The number
of brokerage transactions increased by 11% and the number of valuation reports
issued grew by 9% year over year. At the same time, the number of brokers
increased by only 1% and the number of appraisers remained stable. During the
period, the Service division began offering valuation services in Bulgaria.
In the first quarter of 2012, the Construction division secured new
construction contracts of 2.9 million euros. At the reporting date, the order
backlog stood at 12.9 million euros against 19.0 million euros at the end of
the first quarter of 2011. The Construction division ended the first quarter
with an operating profit of 0.4 million euros compared with an operating loss
of 0.1 million euros incurred in the first quarter of 2011.
After the reporting date, in April 2012, the Group sold its stake in the joint
venture Bišumuižas Nami SIA to the co-venturer SIA Linstow Baltic. The Group
sought possibilities for exiting the project for over a year. Through the
transaction, the Group disposed of the obligation to support the joint venture
in the development of apartment buildings and in servicing loan liabilities. In
2011 we financed the joint venture to the extent of 0.3 million euros and
Bišumuižas Nami SIA’s loan liabilities alone totalled 14 million euros.
In the first quarter, the Group’s loans and borrowings decreased by 1 million
euros while equity to assets ratio remained more or less stable at around 40%.
The weighted average interest rate of interest-bearing loans and borrowings has
decreased by 0.1 percentage points compared with a year ago, mainly in
connection with a decline in EURIBOR. The weighted average duration of loans
and borrowings has extended slightly, from 2.1 years to 2.3 years.
KEY PERFORMANCE INDICATORS
-- The Group ended the first quarter of 2012 with revenue of 3.6 million
euros. Revenue for the first quarter of 2011 was 13.3 million euros
(including 8.3 million euros earned on the sale of the Tivoli properties).
Excluding the effect of the Tivoli transaction, revenue for the first
quarter of 2012 was 27% smaller than a year ago.
-- Operating loss for the period was 0.5 million euros. Compared with the
first quarter of 2011 when the figure was 0.9 million euros, operating loss
has decreased by 48%.
-- Net loss for the first quarter was 0.9 million euros, a 35% decrease from
the net loss of 1.3 million euros incurred in the first quarter of 2011.
-- Equity to assets ratio at period-end was 40.1% (31 December 2011: 39.7%).
Return on equity (12 months rolling) was negative.
-- At the end of the first quarter, the Group’s order backlog stood at 12.9
million euros compared with 19.0 million euros at the end of the first
quarter of 2011.
-- During the first quarter, the Group sold 4 apartments and plots (Q1 2011:
13 apartments and plots) in its self-developed projects.
Q1 2012 Q1 2011
-----------------------------------------------------------
In millions of euros
-----------------------------------------------------------
Revenue 3.6 13.3
-----------------------------------------------------------
Operating loss -0.5 -0.9
-----------------------------------------------------------
Net loss -0.9 -1.3
-----------------------------------------------------------
-----------------------------------------------------------
EPS (in euros) -0.18 -0.28
-----------------------------------------------------------
-----------------------------------------------------------
Total assets at period-end 57.7 65.5
-----------------------------------------------------------
Invested capital at period-end 47.1 53.2
-----------------------------------------------------------
Net loans at period-end 22.3 24.4
-----------------------------------------------------------
Equity at period-end 23.1 26.5
-----------------------------------------------------------
-----------------------------------------------------------
Average loan term (in years) 2.3 2.1
-----------------------------------------------------------
Average interest rate of loans (per year) 6.9% 7.0%
-----------------------------------------------------------
ROIC (rolling, 4 quarters) neg 1.2%
-----------------------------------------------------------
ROE (rolling, 4 quarters) neg neg
-----------------------------------------------------------
-----------------------------------------------------------
Number of staff at period-end 140 150
-----------------------------------------------------------
REVENUE AND PROFIT
Q1 2012 Q1 2011
------------------------------------------------------
In millions of euros
------------------------------------------------------
Revenue
------------------------------------------------------
Service 0.6 0.5
------------------------------------------------------
Development 0.7 9.9
------------------------------------------------------
Construction 2.4 2.9
------------------------------------------------------
Eliminations -0.1 0.0
------------------------------------------------------
Total revenue 3.6 13.3
------------------------------------------------------
------------------------------------------------------
Operating profit/loss
------------------------------------------------------
Service 0.0 0.0
------------------------------------------------------
Development -0.6 -0.6
------------------------------------------------------
Construction 0.4 -0.1
------------------------------------------------------
Eliminations 0.0 0.1
------------------------------------------------------
Unallocated income and expenses, net -0.3 -0.3
------------------------------------------------------
Total operating loss -0.5 -0.9
------------------------------------------------------
------------------------------------------------------
Interest income and expense, net -0.4 -0.4
------------------------------------------------------
Net loss -0.9 -1.3
------------------------------------------------------
The Development division’s revenue for the first quarter of 2011 was
significantly impacted by the sale of inventory of 8.3 million euros to joint
venture Tivoli Arendus OÜ.
CASH FLOWS
Q1 2012 Q1 2011
------------------------------------------------------------------
In millions of euros
------------------------------------------------------------------
Cash flows from operating activities -1.2 -0.7
------------------------------------------------------------------
Cash flows from investing activities 1.0 -0.4
------------------------------------------------------------------
Cash flows from financing activities -0.3 -0.9
------------------------------------------------------------------
Net cash flow -0.4 -2.0
------------------------------------------------------------------
------------------------------------------------------------------
Cash and cash equivalents at beginning of period 2.2 4.2
------------------------------------------------------------------
Cash and cash equivalents at end of period 1.8 2.2
------------------------------------------------------------------
At 31 March 2012, the largest current liabilities to be settled in the next 12
months comprised:
-- estimated principal repayments to be made on the sale of reserved premises
and payments under the settlement schedule of the loan taken for the
Boulevard Residence Madrid project in Sofia of 2.5 million euros;
-- repayments of the loan taken for the Manastirski project of 1.9 million
euros;
-- repayments of the construction loan taken by AS Kolde of 2.4 million euros;
-- repayments of the loan taken for the Bišumuiža 1 project of 0.5 million
euros.
In the first quarter of 2012, the Group made repayments of the loan taken for
the Bišumuiža-1 project in Riga and repaid the Kerberon loan in full. The Group
also made scheduled repayments of loans taken for its cash flow generating
projects and followed the principal repayments schedule agreed for the bank
loan taken by Koduküla OÜ.
SERVICE DIVISION
In the first quarter of 2012, the Service division performed better than a year
ago, ending the period with an operating loss of 5 thousand euros compared with
an operating loss of 32 thousand euros for the first quarter of 2011. Revenue
for the first quarter of 2012 was 573 thousand euros, 13% up on the first
quarter of 2011. The number of brokerage transactions increased by 11% and the
number of valuation reports issued grew by 9% year over year. At the same time,
the number of brokers increased by only 1% and the number of appraisers
remained stable.
Q1 2012 Q1 2011 Change, %
------------------------------------------------------------------------------
Number of completed brokerage transactions 313 281 11%
------------------------------------------------------------------------------
Number of projects on sale at end of period 162 158 3%
------------------------------------------------------------------------------
Number of valuation reports issued 1,382 1,270 9%
------------------------------------------------------------------------------
Number of appraisers at end of period¹ 39 39 0%
------------------------------------------------------------------------------
Number of brokers at end of period¹ 75 69 1%
------------------------------------------------------------------------------
Number of staff at end of period 45 49 -8%
------------------------------------------------------------------------------
¹ Includes people working under service contracts
DEVELOPMENT DIVISION
In the first quarter of 2012, four apartments were sold in Arco Vara’s
projects: three apartments in the Bišumuiža project in Latvia and one apartment
in the Kodukolde project in Estonia. It should be noted that the figure does
not yet include the apartments sold in the recently completed apartment block
in the Manastirski project and the two apartment buildings, which will be
completed in the Kodukolde project in June. In those projects currently only
contracts under the law of obligations have been signed (under Estonian
legislation, in a real estate transaction a contract under the law of
obligations is signed when the buyer makes a prepayment and the parties agree
the terms and conditions of sale, thus it is essentially a presale contract;
title to the property transfers under a real right contract, which is usually
signed when the real estate is complete). The sales of those apartments will be
included in the division’s revenue from the second quarter.
In 2011 the Development division found a partner, International Invest Project
OÜ, for the Tivoli project and raised financing for the construction of phase
I. Last year contaminated land was remediated and design work began. In the
fourth quarter, Tivoli Arendus OÜ obtained a permit for the construction of six
residential buildings. According to plan, construction work will begin in the
summer of 2012.
Phase V of the Kodukolde development project (50 apartments) was completed in
June 2011. By the end of the first quarter of 2012, all apartments in that
phase had been sold. The construction of phase VI at Helme 16 in Tallinn (48
apartments) began in the second quarter of 2011. The work is performed and
substantially financed by AS Merko Ehitus Eesti. The buildings are scheduled
for completion in June 2012. By the end of the first quarter, half of the
apartments in phase VI had been reserved on the basis of contracts under the
law of obligations.
In January 2012, the division obtained a permit for the construction of a
residential and commercial building of energy class B called Kastanimaja
(Chestnut House), designed to be located at Tehnika 53 in Tallinn. Construction
of the building was put out to tender in the first quarter of 2012. To date,
the best two bidders have been selected and negotiations on signing a
construction contract are under way. According to plan, construction work
should be completed within 14 months. Preliminary sale of apartments began in
May 2012.
During the period, the division completed the construction of phase I in the
Manastirski project in Bulgaria. As at 31 March 2012, 65% of the apartments
were reserved. In the commercial and residential building Boulevard Residence
Madrid in Sofia the division continues to lease out commercial premises, to
deliver reserved apartments under real right contracts, and to sell the
remaining free apartments.
In June 2012, the fourth building (14 apartments) will be completed in phase II
of the Bišumuiža 1 apartment buildings development project in Latvia.
Altogether, phase II consists of five buildings.
At the end of March 2012, the Development division employed 25 people (31
December 2011: 24).
For further information on our projects, please refer to:
www.arcorealestate.com/development.
CONSTRUCTION DIVISION
The Construction division specialises in environmental and civil engineering.
At the end of the first quarter of 2012, the largest contracts in progress
included the design and build of the reconstruction and extension of the public
water and wastewater systems of the Suure-Jaani rural municipality (two phases
with a total remaining balance of 3.9 million euros), the construction of the
Paide wastewater treatment plant (remaining balance 2.7 million euros), the
design and build of water and wastewater pipelines for the city of Loksa
(remaining balance 2.5 million euros) and the construction of the Kuusalu
public water and wastewater network (remaining balance 2 million euros).
In the first quarter of 2012, the division secured new construction contracts
of 2.9 million euros. At the reporting date, the order backlog stood at 12.9
million euros compared with 19.0 million euros at the end of the first quarter
of 2011.
At the end of March 2012, the Construction division employed 53 people (31
December 2011: 58).
Consolidated statement of comprehensive income
Note Q1 2012 Q1 2011
-----------------------------------------------------------------------------
In thousands of euros
-----------------------------------------------------------------------------
Revenue from rendering of services 3,368 3,737
-----------------------------------------------------------------------------
Revenue from sale of goods 260 9,522
-----------------------------------------------------------------------------
Total revenue 2, 3 3,628 13,259
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
Cost of sales 4 -2,815 -12,692
-----------------------------------------------------------------------------
Gross profit 813 567
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
Other income 7 192 5
-----------------------------------------------------------------------------
Marketing and distribution expenses 5 -82 -102
-----------------------------------------------------------------------------
Administrative expenses 6 -697 -1,361
-----------------------------------------------------------------------------
Other expenses 7 -716 -43
-----------------------------------------------------------------------------
Operating loss -490 -934
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
Finance income 8 22 34
-----------------------------------------------------------------------------
Finance expenses 8 -394 -421
-----------------------------------------------------------------------------
Loss before tax -862 -1,321
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
Loss for the period -862 -1,321
-----------------------------------------------------------------------------
------------------------------------------------------------
Loss attributable to owners of the parent -847 -1,334
-----------------
Profit/loss attributable to non-controlling interests -15 13
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
Total comprehensive expense for the period -862 -1,321
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
Earnings per share (in euros) 9
-----------------------------------------------------------------------------
- Basic -0.18 -0.28
-----------------------------------------------------------------------------
- Diluted -0.18 -0.28
-----------------------------------------------------------------------------
Consolidated statement of financial position
Note 31 March 31 December
2012 2011
--------------------------------------------------------------------------------
In thousands of euros
--------------------------------------------------------------------------------
Cash and cash equivalents 1,787 2,209
--------------------------------------------------------------------------------
Trade and other receivables 10 7,648 7,012
--------------------------------------------------------------------------------
Prepayments 397 433
--------------------------------------------------------------------------------
Inventories 11 23,178 21,564
--------------------------------------------------------------------------------
Non-current assets held for sale 0 469
--------------------------------------------------------------------------------
Total current assets 33,010 31,687
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Investments in equity-accounted investees 4 4
-----------------------------------
Other investments 8 8
--------------------------------------------------------------------------------
Trade and other receivables 10 3,135 3,058
--------------------------------------------------------------------------------
Deferred income tax asset 250 250
-----------------------------------
Investment property 12 20,306 24,046
--------------------------------------------------------------------------------
Property, plant and equipment 920 934
--------------------------------------------------------------------------------
Intangible assets 25 26
--------------------------------------------------------------------------------
Total non-current assets 24,648 28,326
--------------------------------------------------------------------------------
TOTAL ASSETS 57,658 60,013
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Loans and borrowings 13 9,425 9,662
--------------------------------------------------------------------------------
Trade and other payables 14 6,930 7,735
--------------------------------------------------------------------------------
Deferred income 2,304 2,012
--------------------------------------------------------------------------------
Provisions 1,201 1,205
--------------------------------------------------------------------------------
Total current liabilities 19,860 20,614
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Loans and borrowings 13 13 929 14 675
--------------------------------------------------------------------------------
Other payables 14 748 741
--------------------------------------------------------------------------------
Total non-current liabilities 14,677 15,416
--------------------------------------------------------------------------------
TOTAL LIABILITIES 34,537 36,030
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Share capital 3,319 3,319
--------------------------------------------------------------------------------
Statutory capital reserve 2,011 2,011
--------------------------------------------------------------------------------
Retained earnings 17,791 18,653
--------------------------------------------------------------------------------
Total equity 23,121 23,983
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Equity attributable to non-controlling 140 155
interests
--------------------------------------------------------------------------------
Equity attributable to equity holders of the 22,981 23,828
parent
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
TOTAL LIABILITIES AND EQUITY 57,658 60,013
--------------------------------------------------------------------------------
Consolidated statement of cash flows
Note Q1 Q1
2012 2011
--------------------------------------------------------------------------------
In thousands of euros
--------------------------------------------------------------------------------
Loss for the period -862 -1,321
--------------------------------------------------------------------------------
Interest income and interest expense, net 8 321 355
--------------------------------------------------------------------------------
Loss on sale of investment property 7 712 0
--------------------------------------------------------------------------------
Depreciation, amortisation and impairment losses on 4, 6 23 25
property, plant and equipment and intangible assets
--------------------------------------------------------------------------------
Foreign exchange gains and losses, net 8 3 4
--------------------------------------------------------------------------------
Operating cash flow before working capital changes 197 -937
--------------------------------------------------------------------------------
Change in receivables and prepayments 169 -1,866
--------------------------------------------------------------------------------
Change in inventories -953 1,504
--------------------------------------------------------------------------------
Change in payables and deferred income -575 591
--------------------------------------------------------------------------------
NET CASH USED IN OPERATING ACTIVITIES -1,162 -708
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Acquisition of property, plant and equipment and -12 -2
intangible assets
--------------------------------------------------------------------------------
Paid on development of investment property 0 -557
--------------------------------------------------------------------------------
Proceeds from sale of investment property 1,140 177
--------------------------------------------------------------------------------
Acquisition of investments in subsidiaries and joint 0 1
ventures
--------------------------------------------------------------------------------
Loans granted 15 -63 -67
--------------------------------------------------------------------------------
Repayment of loans granted 0 29
--------------------------------------------------------------------------------
Other payments related to investing activities -29 0
--------------------------------------------------------------------------------
Interest received 3 24
--------------------------------------------------------------------------------
NET CASH FROM/USED IN INVESTING ACTIVITIES 1,039 -395
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Proceeds from loans received 13 261 504
--------------------------------------------------------------------------------
Settlement of loans and finance lease liabilities 13 -165 -876
--------------------------------------------------------------------------------
Interest paid -393 -537
--------------------------------------------------------------------------------
Other payments related to financing activities -2 0
--------------------------------------------------------------------------------
NET CASH USED IN FINANCING ACTIVITIES -299 -909
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
NET CASH FLOW -422 -2,012
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Cash and cash equivalents at beginning of period 2,209 4,209
--------------------------------------------------------------------------------
Decrease in cash and cash equivalents -422 -2,012
--------------------------------------------------------------------------------
Cash and cash equivalents at end of period 1,787 2,197
--------------------------------------------------------------------------------
Egert Paulberg
Financial Controller
Arco Vara AS
Phone: +372 614 4503
[email protected]