Börsiteade

Hepsor AS

LEI kood

254900NNCQC3L9WR9P45

Emitendi suuruskategooria

Keskmise suurusega kontsern

Majandustegevusalad

Kutse-, teadus- ja tehnikaalane tegevus

Sektor(id)

AIFi valitseja

Emitendi registreeritud asukoht

Eesti

Üldandmed

Kategooriad

Juhtkonna vaheteadaanne või kvartaalne finantsaruanne

Kas teade sisaldab isikuandmeid?

Ei

Kas esitatud teave on vabatahtlik?

Ei

Esitatava teabe algkeel

Eesti keel

Kas teave hõlmab perioodi?

Jah

Teabe alguskuupäev

01.07.2026

Teabe lõppkuupäev

30.09.2026

Versioon

1

Teate ID

19142

Esitamise kuupäev ja aeg

28.10.2026 08:00:00

Teate sisu eesti keeles

Pealkiri

Hepsor AS 2026 III kvartali ja 9 kuu konsolideeritud auditeerimata vahearuanne

Teade

2026. aasta esimesed üheksa kuud on Hepsori jaoks olnud aktiivse arendustegevuse ja mahukate investeeringute periood. Kontsern on jõudnud investeerimistsükli kõige kapitalimahukamasse etappi, mida peegeldab bilansimahu aastane 44%-line kasv. 2025. aastal alanud uus ja senisest mahukam investeerimistsükkel loob tugeva aluse kontserni edasisele arengule. Tehtud investeeringute tulemused hakkavad järk-järgult kajastuma kontserni finantstulemustes alates 2026. aasta neljandast kvartalist, mil arendusprojektid jõuavad realiseerimisfaasi.

Aruandeperioodi finantstulemusi mõjutas eelkõige müügiks valmis korterite väike jääk. Alustasime aastat 28 valmis korteriga ning tänaseks on neist müümata veel üks korter. Aruande avaldamise ajaks on Hepsor alustanud Tallinnas, Manufaktuuri kvartalis asuva M12- nimelise arendusprojekti korterite üleandmist, mis tähistab ligi kaheaastase perioodi lõppu, mil kontsernil Eestis uusi kortermaju ei valminud.

Hepsori arendusportfelli potentsiaalne müügitulu ulatus 30. septembri 2026 seisuga 535 miljoni euroni (30.09.2025: 385 miljonit eurot), millest 86% (30.09.2025: 82%) moodustas elukondlik kinnisvara ja 14% (30.09.2025: 18%) ärikinnisvara.

Kontserni 2026. aasta esimese üheksa kuu müügitulu oli 7,6 miljonit eurot (9 kuud 2025: 30,9 miljonit eurot) ja aruandeaasta kolmanda kvartali müügitulu oli 1,3 miljonit eurot (III kvartal 2025: 8,8 miljonit eurot).

Aruandeaasta üheksa kuu puhaskahjum oli 3,2 miljonit eurot (9 kuud 2025: puhaskasum 1,5 miljonit eurot), millest emaettevõtte omanike puhaskahjum oli 2,9 miljonit eurot (9 kuud 2025: puhaskasum 0,9 miljonit eurot).

Kontserni kolmanda kvartali puhaskahjum oli 1,0 miljonit eurot (III kvartal 2025: puhaskasum 1,2 miljonit eurot), millest emaettevõtte omanike kahjumiks kujunes 1,0 miljonit eurot (III kvartal 2025: puhaskasum 1,1 miljonit eurot).

Kontserni bilansimaht on aastaga kasvanud 44% ulatudes seisuga 30.09.2026 – 116,0 miljoni euroni (30.09.2025: 80,7 miljonit eurot).

Septembris viis Hepsor 20 miljoni euro suuruse võlakirjaprogrammi raames läbi teise avaliku emissiooni, milles 974 investorit märkisid võlakirju 7,1 miljoni euro väärtuses. Pakkumise esialgne maht märgiti 2,4-kordselt üle ning suure huvi tõttu suurendati emissiooni mahtu 3 miljonilt 5 miljoni euroni.

Ehituses ja müügis olevad arendusprojektid

2026. aasta esimesel üheksal kuul sõlmis kontsern võla- ja asjaõiguslepingute alusel 175 korteri esmamüüki koguväärtusega 34,5 miljonit eurot, mis on vastavalt 31% ja 27% enam kui aasta varem (9 kuud 2025: 134 korterit ja 27,1 miljonit eurot).

Aruandekvartali lõpu seisuga ulatus nelja kvartali keskmine esmamüükide maht 10,8 miljoni euroni (30.09.2025: 8,6 miljonit eurot), kasvades aastaga 26%.

30.09.2026 seisuga oli kontsernil eelmüügis ja müügis 7 elukondlikku arendusprojekti (30.09.2025: 9 elukondlikku arendusprojekti), millest üks oli valminud ning kuus ehituses.

Kontsernil on ehituses 548 korterit (30.09.2025: 374), millest 289 korterit Eestis (30.09.2025: 201)  ja 259 korterit Lätis (30.09.2025: 173).

Ärikinnisvara

Seisuga 30.09.2026 on Hepsori valmis ärikinnisvara portfellist, mis koosneb neljast projektist kogumahuga 16 678 m², üürilepingutega kaetud 92% üüritavast pinnast.

SIA „Riga Properties 4“ osanikud otsustasid loobuda kavandatud ärikinnisvaraprojekti arendamisest ning panna ettevõttele kuuluvad kinnistud müüki. Otsuse tegemisel lähtuti ärikinnisvaraturu praegusest nõudlusest ja projekti arendusväljavaadetest.

Kanada arendusprojektid

2026. aasta kolmas kvartal oli Hepsori Kanada arendusprojektide jaoks oluline. Toronto linnavolikogu otsustega jõustusid ehitusõigused kahes arendusprojektis – Isabella ja Elysium Glenavy.

Isabella arendusprojektis on võimalik rajada ligikaudu 46 000 m² ehitusmahuga 70-korruseline üürikortermaja ning Elysium Glenavy projektis ligikaudu 26 500 m² ehitusmahuga 36-korruseline üürikortermaja.

Koos 2025. aastal ehitusõiguse saanud Weston Roadi projektiga on Hepsori viiest Kanada arendusprojektist kolmes saavutatud kavandatud ehitusmaht.

Tulevikuvaade

2026. aasta neljandas kvartalis on kavandatud kahe elukondliku arendusprojekti valmimine: Tallinnas Manufaktuuri 12 aadressil asuv 49 korteriga M12 arendusprojekt ning Riias 103 korteriga 360° Dzelzavas Residences arendusprojekt. Kokku valmib kahes projektis 152 uut korterit, millest 30. septembri seisuga oli võlaõiguslepingutega müüdud 75 korterit.

Käesoleva aasta viimases kvartalis keskendume eelkõige ehituses olevate arendusprojektide valmimisele, korterite müügile ning uute projektide ettevalmistamisele.

Eestis on olulisel kohal Manufaktuuri kvartali arendustegevuse jätkamine ja Paevälja kvartali esimese etapi ehitus. Neljandas kvartalis on kavandatud Rae vallas aadressil Vana-Tartu mnt 49 Veski Keskuse arendusprojekti ehituse algus. Veski Keskusesse on planeeritud 3 551 m² üüritavat pinda, millest 96% on üürilepingutega kaetud.

Lätis jätkame mitme uue elukondliku arendusprojekti ettevalmistamist ja elluviimist. 2026. aastal on kavas alustada ehitust Riias aadressil Starta 17 asuva arendusprojekti esimeses etapis, mille käigus valmib 84 korterit.

Konsolideeritud finantsseisundi aruanne

tuhandetes eurodes

30.09.2026

31.12.2025

30.09.2025

 

 

 

 

Varad

 

 

 

Käibevarad

 

 

 

Raha ja raha ekvivalendid

7 410

3 821

1 867

Lühiajalised finantsinvesteeringud

50

0

0

Nõuded ja ettemaksed

1 879

1 807

1 796

Lühiajalised laenunõuded

425

0

0

Varud

76 628

58 938

53 994

Käibevarad kokku

86 392

64 566

57 657

Põhivarad

 

 

 

Materiaalne põhivara

208

260

274

Immateriaalne põhivara

0

0

1

Kinnisvarainvesteering

11 820

11 820

7 980

Finantsinvesteeringud

9 078

7 837

7 550

Investeeringud ühisettevõtetesse

451

26

1

Pikaajalised laenunõuded

6 651

6 521

6 572

Muud pikaajalised nõuded

1 351

805

631

Põhivarad kokku

29 559

27 269

23 009

Varad kokku

115 951

91 835

80 666

Kohustised ja omakapital

 

 

 

Lühiajalised kohustised

 

 

 

Lühiajalised laenukohustised

1 617

5 687

8 192

Lühiajalised rendikohustised

12

50

13

Ettemaksed klientidelt

4 530

1 544

1 211

Võlad tarnijatele ja muud võlad

7 973

6 832

5 255

Lühiajalised kohustised kokku

14 132

14 113

14 671

Pikaajalised kohustised

 

 

 

Pikaajalised laenukohustised

67 917

42 060

36 720

Pikaajalised rendikohustised

112

112

162

Muud pikaajalised kohustised

9 213

8 472

7 500

Pikaajalised kohustised kokku

77 242

50 644

44 382

Kohustised kokku

91 374

64 757

59 053

Omakapital

 

 

 

Aktsiakapital

3 913

3 913

3 913

Ülekurss

8 917

8 917

8 917

Reservkapital

385

385

385

Jaotamata kasum

11 362

13 863

8 398

Omakapital kokku

24 577

27 078

21 613

sh emaettevõtte omanikele kuuluv omakapital kokku

16 999

20 858

21 323

sh vähemusosanikele kuuluv omakapital kokku

7 578

6 220

290

Kohustised ja omakapital kokku

115 951

91 835

80 666

Konsolideeritud koondkasumi aruanne

tuhandetes eurodes

9 kuud 2026

9 kuud 2025

III kvartal 2026

III kvartal 2025

 

 

 

 

 

Müügitulu

7 568

30 888

1 344

8 825

Müüdud kaupade ja teenuste kulu (-)

-6 766

-25 946

-958

-6 743

Brutokasum

802

4 942

386

2 082

Turustuskulud (-)

-799

-676

-303

-228

Üldhalduskulud (-)

-1 420

-1 356

-559

-438

Muud äritulud

44

314

27

232

Muud ärikulud (-)

-50

-211

-15

-45

Ärikasum/-kahjum

-1 423

3 013

-464

1 603

Finantstulud

616

322

248

165

Finantskulud (-)

-2 048

-1 527

-751

-525

Kasum enne tulumaksu

-2 855

1 808

-967

1 243

Tulumaks

-323

-283

-1

0

Aruandeperioodi puhaskasum

-3 178

1 525

-968

1 243

    Emaettevõtte omanikele kuuluv osa puhaskasumis/-kahjumis

-2 878

937

-962

1 133

    Vähemusosalusele kuuluv osa puhaskasumis/-kahjumis

-300

588

-6

110

 

 

 

 

 

Koondkasum/-kahjum

 

 

 

 

Omanikuvahetusega seotud muutused

-137

-81

-353

-81

Vähemusosaluse varjatud tuletisinstrumentide väärtuse muutus

-98

-534

-59

-106

Valuutakursi vahed välisettevõtete ümberarvestusel

-12

-375

29

-83

Aruandeperioodi muu koondkasum kokku

-247

-990

-383

-270

    Emaettevõtte omanikele kuuluv osa muu koondkasumis/-kahjumis

75

418

65

759

    Vähemusosalusele kuuluv osa koondkasumis

-322

-1 408

-448

-1 029

 

 

 

 

 

Aruandeperioodi koondkasum kokku

-3 425

535

-1 351

973

    Emaettevõtte omanikele kuuluv osa koondkasumis/-kahjumis

-2 803

1 355

-897

1 892

    Vähemusosalusele kuuluv osa koondkasumis/-kahjumis

-622

-820

-454

-919

 

 

 

 

 

Kasum aktsia kohta

 

 

 

 

    Tava (eurot aktsia kohta)

-0,74

0,24

-0,46

0,29

    Lahustatud (eurot aktsia kohta)

-0,74

0,24

-0,46

0,29

Täispika 2026. aasta III kvartali ja 9 kuu konsolideeritud auditeerimata vahearuandega saab tutvuda Hepsori kodulehel: https://hepsor.ee/investorile/aktsia/aruandedjaesitlused/

Martti Krass
Juhatuse liige
Telefon: +372 5692 4919
e-post: [email protected]

Hepsor AS (www.hepsor.ee) on elukondliku ja ärikinnisvara arendaja. Kontsern tegutseb Eestis, Lätis ja Kanadas. Viieteistkümne tegutsemisaasta jooksul oleme loonud üle 2 000 kodu ja ligi 44 000 m2 äripindu. Hepsor on esimese arendajana Balti riikides rakendanud mitmeid uuenduslikke insenertehnilisi lahendusi, mis muudavad ettevõtte rajatavad hooned energiasäästlikumaks ja seeläbi keskkonnasõbralikumaks. Ettevõtte portfellis on kokku 28 arendusprojekti kogupindalaga 195 800 m2. Lisaks tegutseb kontsern viies Kanada projektis, kus põhitegevuseks on maa detailplaneeringute koostamine ning seeläbi suurema ehitusõiguse saavutamine.


Teate sisu inglise keeles

Pealkiri

Hepsor AS consolidated unaudited interim report for Q3 2026 and nine months

Teade

The first nine months of 2026 were characterised by active development and substantial investments for Hepsor. The Group has reached the most capital-intensive stage of its investment cycle, as reflected in the 44% year-on-year increase in total assets. The new and larger-scale investment cycle, which began in 2025, provides a solid foundation for the Group's future growth. The investments made are expected to be gradually reflected in the Group's financial results from the fourth quarter of 2026 onwards, as development projects enter the sales and handover phase.

The financial results for the reporting period were primarily affected by the limited inventory of completed apartments available for sale. The Group started the year with 28 completed apartments, of which only one remains unsold to date. By the publication date of this report, Hepsor had commenced the handover of apartments in the M12 development project in the Manufaktuuri Quarter, marking the end of a nearly two-year period during which no new residential buildings were completed by the Group in Estonia.

As at 30 September 2026, the potential sales revenue of Hepsor’s development portfolio amounted to 535 million euros (30 September 2025: 385 million euros), of which residential real estate accounted for 86% (30 September 2025: 82%) and commercial real estate for 14% (30 September 2025: 18%).

The Group's sales revenue for the first nine months of 2026 was 7.6 million euros (9 months 2025: 30.9 million euros), and revenue for the third quarter of the reporting year was 1.3 million euros (Q3 2025: 8.8 million euros).

The Group's net loss for the first nine months of the reporting year was 3.2 million euros (9 months 2025: net profit of 1.5 million euros), of which the net loss attributable to the owners of the parent was 2.9 million euros (9 months 2025: net profit 0.9 million euros).

The Group's net loss for the third quarter amounted to 1.0 million euros (Q3 2025: net profit of 1.2 million euros), of which the loss attributable to owners of the parent company amounted to 1.0 million euros (Q3 2025: net profit of 1.1 million euros).

The Group’s total assets increased by 44% year-on-year, reaching 116.0 million euros as at 30 September 2026 (30 September 2025: 80.7 million euros).

In September, Hepsor carried out its second public bond offering under its 20 million euro bond programme. A total of 974 investors subscribed for bonds worth 7.1 million euros. The initial offering was oversubscribed 2.4 times, and in response to strong investor demand, the issue size was increased from 3 million euros to 5 million euros.

Development projects under construction and on sale

During the first nine months of 2026, the Group concluded contracts under the law of obligations and real right contracts for the first-time sale of 175 apartments with a total value of 34.5 million euros, representing increases of 31% and 27%, respectively, compared with the same period of the previous year (9 months 2025: 134 apartments and 27.1 million euros).

At the end of the reporting quarter, the four-quarter average value of first-time sales reached 10.8 million euros (30 September 2025: 8.6 million euros), representing a year-on-year increase of 26%.

As at 30 September 2026, the Group had 7 residential development projects in pre-sale and sale (30 September 2025: 9 residential development projects), of which one had been completed and six were under construction.

The Group had 548 apartments under construction (30 September 2025: 374), comprising 289 apartments in Estonia (30 September 2025: 201) and 259 apartments in Latvia (30 September 2025: 173).

Commercial Real Estate

As at 30 September 2026, 92% of the leasable area in Hepsor's completed commercial real estate portfolio – comprising four projects with a total area of 16,678 m² – is covered by lease agreements.

The shareholders of SIA “Riga Properties 4” decided not to proceed with the planned commercial real estate development project and to put the properties owned by the company up for sale. The decision was based on current demand in the commercial real estate market and the development prospects of the project.

Canadian development projects

The third quarter of 2026 was significant for Hepsor's Canadian development projects. Following decisions of Toronto City Council, building rights came into force for two development projects – Isabella and Elysium Glenavy.

The Isabella development project allows for the construction of a 70-storey rental apartment building with a gross building area of approximately 46,000 m², and the Elysium Glenavy project a 36-storey rental apartment building with a gross building area of approximately 26,500 m².

Together with the Weston Road project, which obtained building rights in 2025, the planned building volume has been achieved in three of Hepsor's five Canadian development projects.

Future outlook

The completion of two residential development projects is planned for the fourth quarter of 2026: the M12 development project at Manufaktuuri 12 in Tallinn, comprising 49 apartments, and the 360° Dzelzavas Residences development project in Riga, comprising 103 apartments. A total of 152 new apartments will be completed across the two projects, of which 75 had been sold under the law of obligations contracts as at 30 September 2026.

In the final quarter of the year, our primary focus will be on completing development projects currently under construction, selling apartments and preparing new projects.

In Estonia, key priorities include continuing the development of the Manufaktuuri Quarter and the construction of the first phase of the Paevälja Quarter. Construction of the Veski Keskus development project at Vana-Tartu mnt 49 in Rae Municipality is scheduled to commence in the fourth quarter. Veski Keskus will provide 3,551 m² of lettable area, of which 96% is already covered by lease agreements.

In Latvia, we continue to prepare and implement several new residential development projects. Construction of the first phase of the development project at Starta 17 in Riga, comprising 84 apartments, is scheduled to commence in 2026.

Consolidated statement of financial position

in thousands of euros

30 September 2026

31 December 2025

30 September 2025

 

 

 

 

Assets

 

 

 

Current assets

 

 

 

Cash and cash equivalents

7,410

3,821

1,867

Current financial investments

50

0

0

Trade and other receivables

1,879

1,807

1,796

Current loan receivables

425

0

0

Inventories

76,628

58,938

53,994

Total current assets

86,392

64,566

57,657

Non-current assets

 

 

 

Property, plant and equipment

208

260

274

Intangible assets

0

0

1

Investment properties

11,820

11,820

7,980

Financial investments

9,078

7,837

7,550

Investments in joint ventures

451

26

1

Non-current loan receivables

6,651

6,521

6,572

Other non-current receivables

1,351

805

631

Total non-current assets

29,559

27,269

23,009

Total assets

115,951

91,835

80,666

Liabilities and equity

 

 

 

Current liabilities

 

 

 

Loans and borrowings

1,617

5,687

8,192

Current lease liabilities

12

50

13

Prepayments from customers

4,530

1,544

1,211

Trade and other payables

7,973

6,832

5,255

Total current liabilities

14,132

14,113

14,671

Non-current liabilities

 

 

 

Loans and borrowings

67,917

42,060

36,720

Non-current lease liabilities

112

112

162

Other non-current liabilities

9,213

8,472

7,500

Total non-current liabilities

77,242

50,644

44,382

Total liabilities

91,374

64,757

59,053

Equity

 

 

 

Share capital

3,913

3,913

3,913

Share premium

8,917

8,917

8,917

Reserves

385

385

385

Retained earnings

11,362

13,863

8,398

Total equity

24,577

27,078

21,613

incl. total equity attributable to owners of the parent

16,999

20,858

21,323

incl. non-controlling interest

7,578

6,220

290

Total liabilities and equity

115,951

91,835

80,666

Consolidated statement of profit and loss and other comprehensive income

in thousands of euros

9 months 2026

9 months 2025

Q3 2026

Q3 2025

 

 

 

 

 

Revenue

7,568

30,888

1,344

8,825

Cost of sales (-)

-6,766

-25,946

-958

-6,743

Gross profit

802

4,942

386

2,082

Marketing expenses (-)

-799

-676

-303

-228

Administrative expenses (-)

-1,420

-1,356

-559

-438

Other operating income

44

314

27

232

Other operating expenses (-)

-50

-211

-15

-45

Operating profit (-loss) of the year

-1,423

3,013

-464

1,603

Financial income

616

322

248

165

Financial expenses (-)

-2,048

-1,527

-751

-525

Profit before tax

-2,855

1,808

-967

1,243

Corporate income tax

-323

-283

-1

0

Net profit (-loss) for the year

-3,178

1,525

-968

1,243

    Attributable to owners of the parent

-2,878

937

-962

1,133

    Non-controlling interest

-300

588

-6

110

 

 

 

 

 

 Other comprehensive income (-loss)

 

 

 

 

Changes related to change of ownership

-137

-81

-353

-81

Change in value of embedded derivatives with minority shareholders

-98

-534

-59

-106

The effects of changes in foreign exchange rates

-12

-375

29

-83

Other comprehensive income (-loss) for the period

-247

-990

-383

-270

    Attributable to owners of the parent

75

418

65

759

    Non-controlling interest

-322

-1,408

-448

-1,029

 

 

 

 

 

Comprehensive income (-loss) for the period

-3,425

535

-1,351

973

    Attributable to owners of the parent

-2,803

1,355

-897

1,892

    Non-controlling interest

-622

-820

-454

-919

 

 

 

 

 

Earnings per share

 

 

 

 

   Basic (euros per share)

-0.74

0.24

-0.25

0.29

   Diluted (euros per share)

-0.74

0.24

-0.25

0.29

The full unaudited consolidated interim report for Q3 and nine months of 2026 is available on Hepsor’s website: https://hepsor.ee/en/for-investors/stock/reports-2

Martti Krass
Member of the Management Board
Phone: +372 5692 4919
e-mail: [email protected]

Hepsor AS (www.hepsor.ee) is a developer of residential and commercial real estate. The Group operates in Estonia, Latvia and Canada. During our fifteen years of operation, we have created 2000 homes and nearly 44 000 m2 of commercial space. Hepsor is the first developer in the Baltic states to implement a number of innovative engineering solutions that make the buildings it constructs more energy efficient, and thus more environmentally friendly.  The company's portfolio includes a total of 28 development projects with a total area of 195 800 m2. In addition, the Group is active in five projects in Canada, where the main activity is the preparation of detailed spatial plans for land, thereby achieving greater building rights.